Changing the retention period for a repository

You can change the Retention period of an existing repository to increase or decrease the period of time it stores job and document data and history information.
To change the Retention period of a repository:
  1. Click the Administration tab.
  2. In the left pane, click Objects Repositories.
  3. Select the repository you want to change the Retention period for.
  4. Click Change Retention Period.
  5. Specify the period of time.
  6. Select the unit of time.
      Note:
    • If you shorten the Retention period, the system deletes all data that have been stored in the repository longer than the new retention period.
  7. Click OK.