Load plan comment

The number of inserter bins, followed by a comma and a comma-delimited list of the materials loaded in each bin of the inserter. For example, this is a load plan for an inserter with 10 bins, of which bins 4, 6, 7, and 9 are empty: 10,Material1,Material2,Material3,,Material5,,,Material8,,Material10.
Database name
Job.LoadPlan.Comment

Usage note: If you change the load plan for a job in the system, and the rules file for the inserter control file uses information in the load plan, use the Process Again action to rerun the step based on the WriteInserterControlFile step template.