Slingshot cost center
Specifies the Slingshot cost center that is associated with the step.
Values:
- Not set (default)
- The step is not associated with a cost center.
A list of Slingshot cost centers that are displayed on the Avanti Slingshot settings page.
- Database name
- StepTemplate.AvantiCostCenter
Usage notes:
- When a step is associated with a Slingshot cost center, RICOH ProcessDirector provides status information to Avanti Slingshot when the step processes each job.
- If a step has a Slingshot cost center specified, it must have a value for Slingshot milestone status to report the status to Slingshot. When the step runs, if one of the two Slingshot properties has a value and the other does not does not, RICOH ProcessDirector writes a warning message to the job log.
- To add or remove cost centers, edit the Slingshot configuration file. On Linux,
/aiw/aiw1/config/avanti.cfg
. On Windows,\aiw\aiw1\config\avanti.cfg
.