Slingshot cost center

Specifies the Slingshot cost center that is associated with the step.

Values:

Not set (default)
The step is not associated with a cost center.

A list of Slingshot cost centers that are displayed on the Avanti Slingshot settings page.

Database name
Step.AvantiCostCenter

Usage notes:

  • When a step is associated with a Slingshot cost center, RICOH ProcessDirector provides status information to Avanti Slingshot when the step processes each job.
  • If a step has a Slingshot cost center specified, it must have a value for Slingshot milestone status to report the status to Slingshot. When the step runs, if one of the two Slingshot properties has a value and the other does not does not, RICOH ProcessDirector writes a warning message to the job log.
  • To add or remove cost centers, edit the Slingshot configuration file. On Linux, /aiw/aiw1/config/avanti.cfg. On Windows, \aiw\aiw1\config\avanti.cfg.